Browse Items (26 total)

  • Tags: dam

The Ben Smith Dam was built in 1847 by Amory Maynard to divert water into a dug out canal to fill Mill Pond. The water was used to run the wheels in the mill, wash the wool and for a sprinkler system.

Assabet Mills smoke stack center back, Music Hall on far right

Near Waltham Street, site of old paper mill. Dam washed out with the Paper Mill Bridge in 1927. Assabet River went on a rampage after a terrific rainstorm. About 1829 a paper mill was built at the corner of Summer and Parker Streets, using the…
Output Formats

atom, dcmes-xml, json, omeka-xml, rss2